The short answer

A business purpose real estate loan is sized against three separate ceilings at once: a share of total cost, a share of the property as it stands today, and a share of what it is worth once the work is finished. The loan is the smallest of the three, and the useful question to ask any lender is not what their maximum is, but which of the three set your number.

The three ceilings, in plain terms

Each one is answering a different worry, which is why lenders run all three rather than picking a favourite.

  • Loan to cost asks how much of the total spend the lender is funding, against how much the borrower is putting in. It is the ceiling that makes sure you have money in the deal.
  • Loan to as-is value asks what the property is worth today, before anything is built or repaired. It is the ceiling that protects the lender if the project stops on day one.
  • Loan to after-completed value asks what it will be worth when the work is done. It is the ceiling that stops a plan from borrowing against optimism.

Why the smallest one wins

Each ceiling produces a number. The loan is the lowest of them, because a lender cannot exceed a limit it set for a reason it still believes in.

This is why two borrowers with the same purchase price get different loans. One is limited by what the parcel is worth today; the other is limited by the share of cost the lender will fund. Same property, different binding limit, different money.

It is also why a lender who advertises a single headline percentage is telling you very little. That number is the maximum of one ceiling, and your loan is set by whichever ceiling is lowest on your deal.

The question worth asking

Ask which limit set your number, and then ask what would move it.

If cost is binding, more of your own money in the deal raises the loan. If as-is value is binding, a better supported valuation, or a different structure, is the lever. If after-completed value is binding, the budget or the scope is what needs to change, because the finished number is not going to move just because everyone hopes it will.

A lender who can answer that in one sentence has actually underwritten the file. A lender who cannot is quoting a number that can move later, and later is usually the closing table.

Where land is different

On raw land there is often no meaningful after-completed value yet, because nothing is being completed: the parcel is being acquired and held, built on later, or resold. When that ceiling has no basis, it stops being a limit rather than becoming a limit of zero, and the loan is set by cost and as-is value.

That distinction matters more than it sounds. A lender that quietly treats a missing after-completed value as zero produces a nonsense number and then explains it as conservatism.

A worked example, with all three numbers visible

Numbers make this concrete faster than any explanation. Take a purchase at 180,000 with a 75,000 renovation, an as-is value of 185,000 and an after-completed value of 330,000. Assume the lender runs 90 percent of cost, 90 percent of as-is value and 70 percent of after-completed value.

Cost is 255,000, so the cost ceiling is 229,500. As-is value gives 166,500. After-completed value gives 231,000.

The lowest is 166,500, so as-is value is binding and that is the loan. Note what just happened: the deal looks healthy on both the cost and the finished-value tests, and neither of those is what decides it. A borrower who only looked at the 70 percent after-completed number would have expected 231,000 and budgeted a 24,000 contribution rather than the 88,500 they actually need.

Now change one input. If the as-is value had come in at 210,000 instead of 185,000, that ceiling becomes 189,000 and it is still binding, but the loan is 22,500 larger. Nothing about the plan changed. One opinion of value did.

What goes into cost, and what does not

Cost is the ceiling borrowers can most directly influence, and it is also the one where the definition varies most between lenders. It is worth asking for the list rather than assuming.

  • Almost always in: the purchase price, the construction or renovation budget, and an assignment fee where one exists.
  • Frequently in: interest reserve, if the loan funds one, and permit and engineering costs.
  • Frequently out: title and closing costs, lender fees and points, insurance, and agent commissions. These are real money you spend and they are not usually part of the cost base the ratio is computed on.
  • Never in: your own time, the value of work you intend to do yourself, and anything you cannot evidence with a contract or an invoice.

Why value opinions come in pairs

On a file that is being worked properly there are two opinions of value in play, and they are not there to duplicate each other.

The loan officer’s number is early, fast and directional. It exists so a borrower can be told roughly where they stand before anybody spends money on a report. It is not the number that funds the loan.

The underwriting number arrives later and it governs. When it lands, it replaces the earlier figure whether it is higher or lower, and a well run process tells the loan officer that it moved rather than letting the borrower find out at closing.

This is the mechanism behind the most common complaint about private lending, which is that the number changed. Usually it did not change arbitrarily. An opinion was replaced by a report, and the file was always going to fund on the report.

What moves each ceiling, specifically

Knowing which limit binds is only useful if you know what to do about it. Each one has a different lever, and pulling the wrong one wastes money.

  • Cost binding: put more of your own money in, or reduce the scope. Getting a second appraisal does nothing, because value is not what is limiting you.
  • As-is value binding: support the value better. Recent comparable sales the appraiser may not have found, a corrected parcel size, an access or utility fact the report got wrong. Or change the structure: cross-collateral from another property raises the collateral base without touching this one.
  • After-completed value binding: the scope or the budget is the problem. You are proposing to spend money that the finished value will not support, and the honest fix is a cheaper build or a different exit, not a more optimistic appraiser.
  • All three close together: the deal is tight and small changes will move the answer. This is the case where locking the budget early matters most.

The holdback, and why the loan is not all available on day one

On a construction or renovation deal the loan amount and the money you actually receive at closing are two different numbers, and conflating them is the second most common surprise after the value question.

The construction portion is held back and released in draws against work completed. So a 229,500 loan on a 75,000 renovation advances 154,500 at closing, and the rest arrives as the work does. That is the point of a draw structure: the lender is funding progress rather than intentions.

Two consequences worth planning for. You need enough cash to start the work before the first draw reimburses you, which is a real working-capital requirement that catches first-time builders. And if the holdback is larger than the loan itself, which happens on refinances where the construction budget exceeds the loan, the holdback is capped at the loan and the initial advance is zero. That is a structural signal that the deal needs more equity rather than a different lender.

Ceilings are not approvals

One last distinction, because it is the one that causes arguments. These three limits size a loan. They do not approve it.

A deal can pass all three ceilings comfortably and still be declined, because the exit is not credible, because the access is not recorded, because the borrower has no liquidity after closing, or because the parcel is in a market the lender does not understand. Equally, a deal can be approved with a number well below what the ceilings permit, because the underwriter is not comfortable at the maximum.

The ceilings are arithmetic. The decision is judgement. A lender who presents the arithmetic as the decision is not telling you what they actually do.

Initial and total are two different limits

On a deal with construction money there are really two questions, not one: how big is the whole loan, and how much comes out on day one. Lenders apply different ceilings to each, and borrowers who only ask about the total get a nasty surprise at closing.

The total is governed by cost and after-completed value, because those are the tests about the finished project. The initial advance is governed by as-is value, because on day one the collateral is the property as it stands and nothing else.

So a deal can carry a comfortable total loan and a thin initial advance at the same time, and that is not a contradiction. It is the two tests doing their separate jobs. The number you need to close is the initial advance; the number you need to finish is the total.

Ask for both. A term sheet that quotes only one of them is answering half the question.

What a limit being exceeded should actually do

There is a design choice underneath all of this that varies between lenders and is worth asking about directly: what happens when a requested amount exceeds one of the ceilings.

One approach is to refuse to size above the limit, so the system returns the maximum and the conversation stops there. It is tidy and it throws away information, because sometimes the right answer is that the limit is exceeded by a small amount for a reason an underwriter would accept.

The approach we take is to size the request, say plainly which ceilings it exceeds and by how much, and let a person decide. The limits are advisory to the underwriter rather than a hard gate, because the underwriter knows things the arithmetic does not: that the appraisal missed a comparable, that the borrower has other collateral, that the exit is unusually certain.

Neither approach is wrong. But you should know which one you are dealing with, because it determines whether a number you were quoted is a ceiling or a starting point.

The interest reserve, and the question it raises

A loan on a property that produces no income has to pay its own interest from somewhere. Either the borrower pays monthly out of pocket, or the loan funds a reserve and pays itself.

A reserve is convenient and it is not free. It is principal you are borrowing, it accrues interest like any other principal, and it counts into the cost base that one of your three ceilings is computed against. So a reserve can raise the cost ceiling and increase the loan, while also increasing what you owe. Both things are true at once.

There is a subtler question underneath, which is whether interest is charged on the whole commitment or only on what has been advanced. Charging on the full amount from day one is simple and expensive for the borrower. Charging on the drawn balance is fairer and more work to administer. Ask which one you are being quoted, because on a deal with a large holdback the difference over twelve months is substantial.

When interest is charged on the drawn balance, one more detail decides the number: whether the construction holdback alone is excluded from the interest base, or the holdback and the reserve together. Those produce different payments, and a lender should be able to say which convention they use without checking.

Also asked

Related questions

How much do I actually get at closing?
On a deal with construction money, less than the loan amount. The construction portion is held back and released in draws against completed work, so a 229,500 loan with a 75,000 renovation advances 154,500 at closing. Ask for the initial advance and the total separately; a term sheet quoting only one answers half the question.
What if the requested loan exceeds one of the limits?
It depends on the lender, and it is worth asking. Some refuse to size above the ceiling and return the maximum. We size the request, say which ceilings it exceeds and by how much, and let an underwriter decide, because the arithmetic does not know about a missed comparable or other collateral. Knowing which approach you are dealing with tells you whether a quoted number is a ceiling or a starting point.
Which limit usually binds on a purchase?
Cost, more often than not, because the purchase price sets the cost base and the as-is value is close to what was just paid for it. On a refinance or a value-add deal the answer changes, which is why the three are run every time rather than assumed.
Does a higher appraisal always mean a bigger loan?
Only if value was the binding limit. If the loan was capped by cost, a higher appraisal changes nothing at all, which surprises people who spent money to get one.
Are these caps hard limits or guidelines?
Treat them as limits. They exist to keep the loan inside the collateral in more than one direction at once, and a lender who waives one on request has told you something about how the rest of the file was underwritten.

Bring us the deal

Five questions, a soft pull, and a document checklist built from your answers.

More from the blog

Published by Entrusted Capital. Nothing here is a commitment to lend or an offer of credit, and every loan described is for business purposes and secured by non owner occupied property. Read it at entrusted-capital.com.