The short answer

Florida impact fees on a new 1,800 square foot single-family house range from nothing in 19 mostly rural counties to more than $34,000 in Manatee and Osceola counties, under the schedules in effect in October 2026 and before water and sewer charges; the table below gives every county with a link to its schedule. The Florida Impact Fee Act, section 163.31801, bars collecting them before the building permit is issued, limits increases, and bars them on same-use replacements that add no impact.

What are impact fees in Florida?

An impact fee is a one-time charge a county, city or special district collects on new construction to pay for the public facilities growth makes necessary. From January 1, 2027, the statutes define it as a one-time charge imposed by a local government on new development to fund the capital costs of public infrastructure needed to serve that development (section 163.3164, as amended by chapter 2026-161).

The money is for building, not running. Section 163.31801 requires it to be earmarked for capital facilities that benefit new users, and its definition of infrastructure excludes repairs and maintenance. One county puts it plainly: the fee can help pay for capital construction, not salaries or operating expenses. The Act governs fees a local government chooses to adopt; it does not require any.

Which impact fees does a new single-family house pay?

The list is set county by county, and many counties scale each fee by living area. A new house typically meets some combination of these. In all three county schedules below, transportation and schools are the two largest.

  • Transportation, or mobility. Some counties, Hillsborough among them, have replaced the road impact fee with a mobility fee, which section 163.3180(5)(i) allows and which must still comply with the Act.
  • Schools, adopted for the school district.
  • Parks and recreation.
  • Fire rescue and emergency medical services, sometimes one fee and sometimes two.
  • Law enforcement, and in some counties libraries, public buildings or correctional facilities.
  • Water and sewer capacity or connection charges, if the lot is on a public utility. These are utility charges outside the Act, which does not apply to water and sewer connection fees (section 163.31801(12)).

What is the Florida Impact Fee Act?

The Florida Impact Fee Act is section 163.31801, Florida Statutes. It sets no fee. It sets the rules a county, city, school district or special district must follow when it adopts one:

  • A study using the most recent and localized data available, within four years of the current update ((4)(a)).
  • A separate accounting fund, and administrative charges limited to actual cost ((4)(b) and (c)).
  • At least 90 days’ notice before a new or increased fee takes effect, and no new or increased fee on a permit application submitted before that date ((4)(d)).
  • No collection earlier than the date the building permit is issued ((4)(e)).
  • A fee proportional to, and with a rational nexus to, the need the construction creates and the benefit it receives ((4)(f) and (g)).
  • A dollar for dollar credit for land, money or construction contributed toward the same category of facility (subsection (5)), and an optional waiver for affordable housing (subsection (11)).
  • In a court challenge, the burden of proof on the government, with no deferential standard (subsection (9)).

How has the Florida impact fee statute changed recently?

Three laws in two years amended the Act, each with its own effective date. The online 2026 Florida Statutes already show the 2027 text, so check the date before relying on a provision.

  • June 26, 2025 (chapter 2025-190): a new subsection (14) bars impact fees on replacing a structure with one of the same land use that adds no impact, covered in detail below.
  • January 1, 2026 (chapter 2025-177): an increase beyond the normal phase-in limits needs a unanimous vote, up from two thirds, and is not available to a government that has not increased the fee within the past five years.
  • January 1, 2027 (chapter 2026-161): fees adopted or increased after July 1, 2026 must rest on a plan-based demonstrated-need study, extraordinary increases are capped at 100 percent over four years, and a new subsection (15) sets a 30 day process for refund or credit requests.

How much can a Florida county raise impact fees?

Section 163.31801(6) sets the speed limit. An increase of up to 25 percent is phased in over two equal annual increments, and one of more than 25 up to 50 percent over four equal installments. No increase may exceed 50 percent, a fee may rise no more than once every four years, and no increase may be retroactive.

The only way past those limits is the extraordinary circumstances route in paragraph (6)(g): a demonstrated-need study completed within the prior 12 months, at least two publicly noticed workshops, a unanimous vote, and a phase-in of two to four equal annual increments.

Marion County’s transportation schedule shows a four-step phase-in, from 70 percent of the calculated impact to 100 percent. A house of 1,501 to 2,499 square feet pays $3,723 on applications from October 1, 2025, $4,254 from October 1, 2026, $4,786 from October 1, 2027 and $5,318 from October 1, 2028.

When are impact fees paid in Florida?

Not before the building permit is issued. Section 163.31801(4)(e) requires every local government that adopts an impact fee to ensure collection is not required any earlier. After that, each county decides.

  • Orange County: due when the permit is ready to issue, at the rate in effect when a legally sufficient application was submitted. A single-family home can defer all of its impact fees to the certificate of occupancy, with no service charge, by applying before the permit issues; a mobile home can defer only the law enforcement fee.
  • Brevard County: in the unincorporated county, due before pre-power and the certificate of occupancy. Cities set their own timing, most before the certificate of occupancy and some at permit.
  • Hillsborough County: assessed before the permit issues, and the assessment holds for the life of the permit. If the permit expires, the fees are reassessed at current rates.
  • Citrus County: usually collected when the building permit is issued.

Who pays impact fees?

The fee attaches to the building permit for new construction, so whoever pulls the permit pays it: the owner, or a builder for the owner. One county describes its fees as collected from developers and home builders. On a house bought finished, the builder paid the fee at permit and recovers it in the price.

Buying or owning a lot triggers nothing. Additions vary by county: Brevard County charges nothing more for an addition or remodel, Hillsborough County may charge when a remodel adds usable area, and Orange County exempts single-family additions under 1,000 square feet.

Some homes are partly exempt. Section 163.31801(11) allows a waiver for affordable housing, and Orange County exempts documented age-restricted homes from its school fee.

Florida impact fees by county: all 67 counties

The table gives what each county’s own published schedule charges a new single-family detached house of 1,800 square feet of living area in the unincorporated county, under the schedules in effect in October 2026, rounded to the dollar. It counts county and school impact fees only: water and sewer charges, permit fees and any city fee come on top.

A range means the fee depends on where the lot sits, usually a mobility or road district and sometimes a fire district. None means the county charges no impact fee today, including the counties that keep fees in their code but have suspended them or set them at zero. Each row links to the county document the figure comes from; a schedule date several years old is still the one the county posts.

Read it as a starting point, not a quote. Fees change, several counties step them up on a set date, and the county’s impact fee office confirms the figure for a specific parcel.

Impact fees on a new 1,800 sq ft single-family house, unincorporated county, October 2026
CountyNew houseWhat it coversSchedule in effectSource
Alachua$3,730 to $7,152Roads (mobility), fire, parks; no school feeMarch 1, 2026 stepCounty impact fees
Baker$2,592Schools onlyCurrent permit applicationPermit application
Bay$600Fire, parks, libraryJanuary 1, 2026; new schedule January 1, 20272026 fee schedule
Bradford$1,060Fire, law enforcement, EMSOctober 1, 2025Permit fees
Brevard$9,838Roads, schools, solid waste, jail, library, fire, EMSJanuary 2, 2017, the newest postedResidential schedule
Broward$8,809Schools only; county road and park fees are suspendedSeptember 2024County ordinance
CalhounNoneNo county impact feeAugust 2026 fee scheduleBuilding fee schedule
Charlotte$7,804Roads, parks, fire, EMS, law enforcement, jail, public buildingsOctober 12, 2022Master fee schedule
Citrus$13,109Roads, schools, parks, library, fire, EMS, law enforcement, public buildingsOctober 28, 2025Fee schedule
Clay$15,467 to $23,583Roads (mobility), schools, fire, law enforcement, jail, parks and more; three fees index up each October, so the current amount may be higherJune 2026County code
Collier$23,524 to $25,456Roads, schools, parks, government buildings, jail, law enforcement, library, EMS, fire by districtMay 1, 2026 (phase 2)Residential rates
ColumbiaNoneFees remain in the code but have been suspended since 2009Suspended since 2009County code
DeSotoNoneNo county impact feeSeptember 8, 2026 fee scheduleFee schedule
Dixie$1,800Roads, sheriff, fire, recreation, at $1 per square foot; yearly indexing may make it higher2009 ordinanceCounty code
Duval$916 to $4,080Roads (mobility) only; up to two houses on an existing lot of record pay nothingIndexed each October 1Mobility fee calculator
Escambia$53Drainage only; other county reports say it charges no impact fees1992 ordinanceCounty code
Flagler$8,783Roads, schools, parks, fire, EMS, law enforcement, libraryMarch 15, 2025Fee schedule
FranklinNoneNo county impact feeCurrent fee scheduleFee schedule
GadsdenNoneNo impact fee in the county codeCode as of June 2024County code
GilchristNoneFees remain in the code but have been suspended since 2012Suspended since 2012Land development code
Glades$9,733Schools, roads, parks, EMSSeptember 20, 2026Fee schedule
GulfNoneNo county impact feeCounty statement, October 2025County code
HamiltonNoneNo county impact feeApril 21, 2026 fee resolutionFee resolution
HardeeNoneNo county impact fee2024 fee scheduleFee schedule
Hendry$6,714Schools, roads, law enforcement, EMS, jailFebruary 10, 2025Impact fees page
Hernando$12,036Schools, roads, parks, public buildings, fire and EMS, law enforcement, library, jailDecember 2, 2025Fee schedule
HighlandsNoneNew fees were voted down on June 30, 2026Not applicableImpact fees page
Hillsborough$19,702 to $23,557Roads (mobility), schools, parks, fireOctober 1, 2022, the newest postedImpact fees page
HolmesNoneNo county impact fee2021 fee scheduleFee schedule
Indian River$9,650Roads, schools, parks, public buildings, fire, law enforcement, plus a 2% admin feeOctober 11, 2022Fee schedule
JacksonNoneNo county impact fee2016 fee scheduleFee schedule
Jefferson$110Fire and EMS; the code can also be read as $2202009 ordinanceCounty code
Lafayette$450Law enforcement onlyOctober 1, 2026 stepPermit fee schedule
Lake$14,425 to $17,439Schools, roads, fire, parks, library, plus a $125 admin feeOctober 1, 2026Impact fees page
Lee$9,304 to $9,855Roads, schools, parks, EMS, fire by districtMay 4, 2026 (fire and EMS)Fee schedule
LeonNoneNo county impact fee2022 fee scheduleFee schedule
Levy$1,613Roads, parks, EMS; an $817 school fee in the code is not confirmed as collected2016 ratesCounty code
LibertyNoneNo county impact fee2026 fee scheduleFee schedule
MadisonNoneNo county impact fee2021 fee resolutionFee schedule
Manatee$34,641Roads, schools, parks, law enforcement, library, public safety; fire districts charge their ownSeptember 9, 2026Fee schedule
Marion$9,552Roads, schools, fire, EMSOctober 1, 2026 stepCounty code
Martin$13,770Roads, schools, parks, public buildings, jail and law enforcement, fire, library, conservationJanuary 1, 2026Impact fees page
Miami-Dade$16,025 to $19,221Roads (mobility), schools, parks, fire, policeDecember 31, 2024Rate schedule
Monroe$633Roads only; a 1992 fire and EMS fee of $105 may also apply; Key West and Layton are outside the district1992 resolutionCounty code
Nassau$17,198 to $18,061Roads (mobility), schools, parks, recreation, fire, law enforcement, administrative facilitiesApril 1, 2026Current fees
Okaloosa$170 to $1,800Fire district fees onlyMarch 5, 2026 county sheetCounty forms
Okeechobee$14,799Roads, jail, schools, law enforcement, public facilities, fire and EMS, parks, libraryMay 14, 2026Fee schedule
Orange$21,784 to $25,634Roads, schools, parks, law enforcement, fireMay 1, 2026 brochureImpact fee brochure
Osceola$36,021 to $37,718Roads (mobility), schools, parks, fireJune 20, 2025Residential rates
Palm Beach$15,534Roads, schools, parks, library, public buildings, fire, law enforcementJanuary 1, 2026Fee schedules
Pasco$22,580 to $28,385Roads (mobility), schools, parks, fire, libraryJuly 1, 2026 (roads)County code
Pinellas$1,679Roads only; two fire districts may add their own2016 ratesCounty code
Polk$17,369 to $18,027Roads, schools, parks, jail, law enforcement, fire, library, EMSJanuary 1, 2026Permitting page
Putnam$7,711Roads, public buildings, fire, parks, law enforcementJune 10, 2025Impact fee notice
St. Johns$17,811Roads, schools, parks, public buildings, fire, law enforcement and jail, conservationMarch 4, 2026Fee tables
St. Lucie$16,488 to $17,801Roads, schools, parks, public buildings, library, fire and EMS, law enforcementOctober 1, 2026 (roads)Road fee schedule
Santa Rosa$1,687Roads onlyJanuary 1, 2026Impact fee page
Sarasota$10,263 to $12,639Roads (mobility), schools, parks, justice, library, government, fire, law enforcement, EMSFebruary 1, 2026 (roads)Impact fees page
Seminole$11,703 to $17,204Roads (mobility), schools, fire, libraryJune 29, 2021County impact fees
Sumter$3,332 to $4,305Roads; fire inside the fire impact areaJanuary 1, 2026Road impact fees
SuwanneeNoneNo county impact feeOctober 2025 fee scheduleFee schedule
TaylorNoneNo county impact fee2017 fee sheetFee information
UnionNoneNo county impact feeSeptember 2026 permit applicationPermit application
Volusia$14,181Roads, schools, parks, fire, EMSJune 3, 2026Residential schedule
WakullaNoneFees remain in the code but have been set at zero since 2011Zero since 2011County code
Walton$641 to $2,952Roads (mobility); some fire districts add their ownDecember 2023 ordinanceMobility plan
Washington$1,154Roads, fire, EMSReinstated May 15, 2023Building department

Why do impact fees differ so much from county to county?

The same house pays more than $14,000 more in Orange County than in Marion County. Each fee rests on the county’s own study of its own growth and costs, as section 163.31801(4)(a) requires, so neighbors can land far apart.

  • Categories. Citrus County charges eight; Marion County charges transportation, fire and emergency medical services, and schools.
  • Zones. Orange County prices transportation by urban, suburban and rural district, and Hillsborough County prices its mobility fee by urban and rural district.
  • Size tiers. Where fees scale by living area, a bigger house on the same lot pays more.
  • Phase-ins, like Marion County’s, described above.
  • City fees. Brevard County collects impact fees for all 16 of its cities, which may collect additional types. Where a county and a city both charge for transportation, section 163.3180(5)(j) requires an interlocal agreement so a new home is not charged twice for the same impact.

Do you pay impact fees when you replace a mobile home in Florida?

Often not, or only the difference. Since June 26, 2025, section 163.31801(14) has barred an impact fee for reconstructing or replacing a previously existing structure of the same land use that does not increase the impact on public facilities. If the replacement significantly increases size, intensity or capacity of use, the fee is limited to the difference in demand.

Counties apply this through their own credit rules. Brevard County says replacing a single-family home with a single-family home, or a mobile home with a new mobile home, is exempt from additional residential impact fees, while a different type may owe more. Nassau County, for permits from April 1, 2026, credits the old home’s conditioned square footage and charges only the net increase.

The catch is the category. Section 320.01(2)(b) defines a manufactured home as a mobile home built on or after June 15, 1976 to federal standards, but fee schedules use their own labels: Orange County lists a manufactured home under single-family residence and a mobile home separately, at its own rates. Replacing an old mobile home with a larger manufactured home can then be treated as a change of use, with credit for the old unit and the difference due. Ask the county how it classifies both units before you price the deal.

How do you claim a credit for a demolished or replaced home?

The credit is not automatic. The county needs evidence of the old structure and applies the credit before the fee is collected, so the paperwork belongs with the permit application.

  • Prove the old structure existed lawfully. Nassau County accepts aerial photographs, property appraiser records and permit records, on a more likely than not standard, for a structure that existed in 1987 or later.
  • Tie the demolition to the new permit. Orange County requires the demolition permit number on the building permit application.
  • Sign what the county asks for. Nassau County uses a notarized affidavit, and can charge back a credit granted on a misrepresentation.
  • Keep the credit on the right parcel. In Nassau County it stays with the parcel that held the old structure.
  • Plan the removal. If the old home still stands when the new one is finished, Nassau County may issue a temporary certificate of occupancy, then requires a demolition permit application within three business days and removal within 180 days of that permit.
  • Check for credits on record. Hillsborough County’s impact fee page explains how to look them up in its online permitting portal.
  • If you believe you overpaid: from January 1, 2027, section 163.31801(15) provides a written request, a decision within 30 days, and a refund or credit within 30 days after you choose one.

How do impact fees fit a construction budget and loan?

The fee falls due at or after permit, before any construction, and construction draws are generally released against work completed and inspected. Unless the county allows a deferral, it is usually paid from your own cash, or from a soft cost line the construction lender has agreed to fund, before the first draw.

Give it its own budget line, priced from the county’s current schedule for that house size and zone, and check for a noticed increase. An application submitted before an increase takes effect keeps the old rate under section 163.31801(4)(d).

A worked example in round numbers: an 1,800 square foot spec house in Orange County’s suburban district owes about $23,980 in county impact fees at permit, plus water and sewer capital charges if it is on county utilities. Filed before the permit issues, the residential deferral moves all five fees to the certificate of occupancy, keeping that cash in the project during the build and leaving a bill due at completion.

Replacement deals reverse the arithmetic. Where an old home is replaced by one of the same use and similar size, the impact fee line can fall to zero, provided the credit is approved before the permit issues.

How do you look up the impact fee for a specific lot?

An hour of checking will usually produce an exact figure. Work in this order.

  • Confirm the jurisdiction. The property appraiser’s parcel record shows whether the lot is in a city or the unincorporated county, which decides whose schedule applies.
  • Find the fee zone. Orange County’s online map has a transportation districts layer you can search by parcel number, and Hillsborough County publishes transportation, park and fire zone maps.
  • Know the house: its land use category and its living area.
  • Use the current schedule or calculator, and read its effective date. Orange County and Hillsborough County both publish online calculators.
  • Ask for a written estimate. Orange County’s impact fee office gives estimates by phone or email.
  • Check for credits and pending increases: any prior structure, credits on record, and any increase noticed but not yet in effect.
  • Ask the utility separately about water and sewer capacity charges.

What to do next if you are buying a lot to build or replace

Price the impact fee before you write the offer, not after the plans are drawn. On a vacant lot it is a fixed cost of the plan; on a lot with an old home, or a former home site, it may be a credit worth thousands, and only if you document it.

If the deal replaces an old mobile home, get the county’s answer on categories and credits in writing, and pull the property appraiser history and permit records for the existing unit before closing. Entrusted Capital is a direct lender that funds manufactured home swaps in Florida with its own capital, a new manufactured home set permanently on a lot in place of an old one, with terms from the person underwriting the file and a soft-pull quote to start.

Also asked

Related questions

What are impact fees in Florida?
Impact fees are one-time charges a Florida county, city or special district collects on new construction to pay for roads, schools, parks, fire, emergency medical and law enforcement facilities that growth requires. They must be spent on capital facilities, not operations, and must follow the Florida Impact Fee Act, section 163.31801. Water and sewer connection fees are separate utility charges outside that Act.
When are impact fees paid in Florida?
Never before the building permit is issued: section 163.31801(4)(e) forbids requiring collection any earlier. Each county then sets its own timing. Orange County collects at permit but lets a single-family home defer to the certificate of occupancy, while unincorporated Brevard County collects before pre-power and the certificate of occupancy. A permit application filed before an increase takes effect keeps the old rate.
Who pays impact fees in Florida?
Whoever pulls the building permit for new construction pays, usually the owner or a builder acting for the owner. Buying or owning vacant land does not trigger the fee. On a new house bought finished, the builder paid it at permit and recovers it in the price. Some counties waive or reduce fees for affordable housing, which section 163.31801(11) allows.
How much are impact fees in Florida by county?
They range from nothing to more than $34,000. Under the schedules in effect in October 2026, 19 of the 67 counties charge no impact fee on a new house. In the other 48 the fee starts under $2,000 in 14, between $2,000 and $9,000 in 8, between $9,000 and $19,000 in 20 and above $19,000 in 6, led by Osceola and Manatee at more than $34,000. The table in this article gives all 67, each linked to the county’s own schedule.
Do you pay impact fees to replace a mobile home in Florida?
Often not, or only the difference. Since June 26, 2025, section 163.31801(14) bars impact fees on replacing a structure with one of the same land use that adds no impact, and limits the fee to the difference when the new home is significantly larger. Counties classify mobile and manufactured homes differently, so confirm the categories and claim the credit before the permit issues.
What is the Florida Impact Fee Act?
It is section 163.31801, Florida Statutes. It requires impact fees to rest on a current local study, be proportional to the impact, sit in a separate fund and be spent on capital facilities. It requires 90 days’ notice of increases, bars collection before the building permit, limits ordinary increases to 50 percent phased in over up to four years, and bars fees on same-use replacements that add no impact.

Bring us the deal

Five questions, a soft pull, and a document checklist built from your answers.

More from the blog

Published by Entrusted Capital. Nothing here is a commitment to lend or an offer of credit, and every loan described is for business purposes and secured by non owner occupied property. Read it at entrusted-capital.com.